guilinhouse
Advertisement
ours
   | index | sitemaps |  
 
  Search    
 
 
 
 Present position:index >> Fit up the procedure >> Fit up the procedure >> Text
The family puts the procedure (7): Confirm in middle period  
Source:    time:2005-1-8 13:51:49        
 
  By customer, designer, project supervision, construct director participate in, sign and confirm at quality report after confirm qualified.

Because the family fits up the dispute caused and increases day by day in recent years, in order to make decoration corporation and consumers both sides all satisfied, consumers will understand soon how to confirm. Consumer can go and confirm according to Beijing building decoration " Beijing home decoration project inspection of quality regulation " that employer's organization work out one's own house fitting qualified.

Confirm it besides determining that fits up the whole result, see mainly whether craft quality is satisfactory. Can appraise from the following several respects to confirm

(1)It is lighting circuit that lay and want and accord with rules, socket, lamps and lanterns switch, total floodgate, leak electricity switch,etc. have sure height, kitchen, air conditioner take the special line to lay, TV aerial and special telephone line should be installed in the position that benefit maintenance.

(2)Drain off water and take smooth, have seepage, backflow, ponding phenomenon, top-grade water piece have pincers mark and wipe phenomenon of spending.

(3)Build the wall newly vertically, the horizontal plane of body of brick is unanimous, the seam is even and neat, the brick is sewn not to exceed 1mm , one scene of whole errors of porcelain does not exceed 0.8 cms .

(4)It is level ceiling that produce error exceed 0.5 , the board and board crack do not exceed 0.3 mms wholly; The plastic ceiling error does not exceed 0.5mm .

(5)It is wood that seal line, horn line, waist line decorations panel touch mouth sew and exceed 0. 2 mms , the line and fastener horn once are sewn and does not go beyond 0.3 mms , decorations panel and board touch mouth exceed 0.2mm , push away and pull whole error go beyond 0.3 mms .

(6)It is that the paint should be smooth, feel well, not sweeping the mark crack, there is no colour difference and nail the eyes in one meter.

(7)Wall flat line frank the body, one have obvious protruding sense and colour difference, use for fumbling and wiping getting rid of the dust. Team's quality with constructing of the construction quality has something to do with; Relate to unit price of project under construction again. Both sides signed a contract before best way was started building , fit up and require and confirmed the standard clearly.

 
VoteL C S】【close
 Relevant comment

 Relevant news
  Comment:              
name:
email:
 

 
     
     
 
Copyright 2004-2005 guilinhouse.net All rights reserved
MSN:china_guilin@hotmail.com  QQ: 287781052   251502701
webmaster@guilinhouse.net  sale@guilinhouse.net